|
Synchronizing Layers When Editing the Component Geometry 'In Place' |
Scroll |
If during in-place editing of a component layers from the assembly, which contains it, can be automatically transferred to it. This is accomplished by clicking Synchronize Layers
in the context menu of the root element of the Layers Tree of the component.
During synchronization, the names, numbers and colors of the layers are transmitted. The properties of layers, such as visibility, activity, and others, are not transferred.
The transfer of layers in the reverse direction — from the component to the assembly — is performed automatically if the placing method is selected for the component on source layers.